If you are asking "Where are my Renewable Energy Credits" then there could be several reasons why you don't see them minted.
RECs will not be created in the following situations:
Situation 1: It has not been 14 days since the meter data was uploaded or you haven't accepted the data.
Solution - Feasible data for single fuel projects will automatically issue RECs 14 days after the QIP uploads the meter data. If you prefer the issuance to occur sooner, then you can accept the reported generation at any time. See Accepting or Disputing Reported Generation Meter Data (Link Here) for more details.
Situation 2: Your QIP has not uploaded data
Solution: There is actually not a universal minting schedule in NYGATS. In short, Generation data just needs to be reported after the end of the vintage month and prior to the Generation Reporting Deadline. You can check with your QIP for their data reporting timeline.
Situation 3: The meter data failed feasibility
Solution: Feasibility failures occur when the data entered exceeds the estimated maximum output of the project. To clear feasibility failures - and issue RECs - have your QIP send hourly meter data to the NYGATS admin (NYGATS@APX.com)
Situation 4: You did not enter fuel splits for a multiple fuel project
Solution The Account Holder can log into the data review screen of a multi-fuel project with pending data by accessing the Review Data/ Self Report column located in the Project Management Module. Select the NYGATS Pending Status hyperlink to review the reported data and enter the allocation (percentage) of the fuels used during the month. Screenshot provided below:
If the amount of RECs that issued is less than you expected then check your Generation Activity Log, or review the article for